wiki:esaEbRIMToDo

Version 41 (modified by ticheler, 16 years ago) ( diff )

--

Open Issues

author: Heikki Doeleman

This page lists the things still needed to be done in the ESA ebRIM project and estimates how many days of work they are.


New issue list

(1) SOAP testing is done using FireFox Poster (Erik), Done

(2) Jose ElementName (GetRecords)

(3) Erik the save facade does not seem to update when the same ISO metadata is offered a second time. Instead, it creates new ebrim stuff in addition to the earlier

  • The save facade does not seem to update when the same ISO metadata is offered a
  • second time. Instead, it creates new ebrim stuff in addition to the earlier
  • Status: The problem cannot be reproduced in a unit test (RegistryObjectListStoreFacadeTest). What is the problem?

The problem was that when I inserted the same ISO more than once in the legacy, (with same UUID), the number of ebrim objects would increase after every insertion. It should remain the same if a real update was happening.

(4) Testing & validating ebrimupdater&iso2ebrim

(5) All test and validate everything like crazy

(6) Security 1: create web service in legacy : Erik, Jose, Heikki

3 days, status 0%

(7) Security 2: use web service in ebRIM app : Erik, Jose, Heikki

2 days, status 0% Reference to User Management provided by Simone: User management

(8) Uploader web service: needs testing

(9) CSW operations: testing of getRecords & getCapabilities & DescribeRecord

(10) Joins : Jose

2 days, status 40%

(11) GET and POST validation for each operation