Changes between Version 2 and Version 3 of CsMapRfcs


Ignore:
Timestamp:
Aug 14, 2008, 11:58:24 AM (16 years ago)
Author:
hugueswski
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • CsMapRfcs

    v2 v3  
    33== Definition and Process ==
    44
    5 RFCs are formal documents that are required for significant technology, or process changes to the project. They typically include both the motivation behind the proposal and a detailed description of the change. Any interested party can write an RFC not just [http://wiki.osgeo.org/wiki/MetaCRS MetaCRS] [http://wiki.osgeo.org/wiki/MetaCRS_PSC PSC] members and developers. Once written they are posted to the project site and an announcement made to the [http://lists.osgeo.org/mailman/listinfo/MetaCRS MetaCRS mailing list]. The author should incorporate and/or respond to all comments received within one week and repost an updated copy of the RFC. The author can begin modifying the RFC in response to feedback after it has been posted for 48 hours. The RFC should not be modified within the first 48 hours to allow everyone a chance to read and provide feedback on the RFC. Once all feedback has been incorporated into the RFC a motion can be brought to the [http://wiki.osgeo.org/wiki/MetaCRS_PSC MetaCRS PSC] for a vote to either accept or reject the RFC.
     5RFCs are formal documents that are required for significant technology, or process changes to the project. They typically include both the motivation behind the proposal and a detailed description of the change.[[BR]]
     6[[BR]]
     7Any interested party can write an RFC not just [http://wiki.osgeo.org/wiki/MetaCRS MetaCRS] [http://wiki.osgeo.org/wiki/MetaCRS_PSC PSC] members and developers.[[BR]]
     8Once written they are posted to the project site and an announcement made to the [http://lists.osgeo.org/mailman/listinfo/MetaCRS MetaCRS mailing list].[[BR]]
     9The author should incorporate and/or respond to all comments received within one week and repost an updated copy of the RFC. The author can begin modifying the RFC in response to feedback after it has been posted for 48 hours. The RFC should not be modified within the first 48 hours to allow everyone a chance to read and provide feedback on the RFC.[[BR]]
     10Once all feedback has been incorporated into the RFC a motion can be brought to the [http://wiki.osgeo.org/wiki/MetaCRS_PSC MetaCRS PSC] for a vote to either accept or reject the RFC.
    611
    712An RFC is required when: