Opened 16 years ago

Closed 16 years ago

#345 closed enhancement (fixed)

rfe: shorten default timeline horizon

Reported by: hamish Owned by: warmerdam
Priority: minor Milestone: Website
Component: Website Version: unspecified
Keywords: trac Cc: grass-dev@…
CPU: Unspecified Platform: Unspecified

Description

Hi,

minor trac system wish wrt https://trac.osgeo.org/grass/timeline

Is it possible to adjust the trac config so it looks back 3 days instead of 30? We have enough activity that 30 days is a lot of commits. It slows down the page download considerably, old news is uninteresting, you can easily manually adjust it if you want to look longer, and I would guess is a burden on the server as well.

the current timeline.htm is 176k. If I set the timeframe to 3 days it reduces to 20k.

paying by the mb at the far end of a wet piece of string,

Hamish

Change History (3)

comment:1 by warmerdam, 16 years ago

Keywords: trac added
Owner: changed from grass-dev@… to warmerdam

Hamish,

I have tentatively changed the "default_daysback" setting in /var/www/trac/grass/conf/trac.ini to 3 and restarted apache. If the group agrees on a different setting let me, or another SAC admin know and it can be altered. I agree 30 days produced too much material for GRASS.

comment:2 by neteler, 16 years ago

Cc: grass-dev@… added

(re-adding the list in CC)

Frank wrote:

Hamish,

I have tentatively changed the "default_daysback" setting in /var/www/trac/grass/conf/trac.ini to 3 and restarted apache. If the group agrees on a different setting let me, or another SAC admin know and it can be altered. I agree 30 days produced too much material for GRASS.

I am fine with that since the user can manually change to something else.

Markus

comment:3 by hamish, 16 years ago

Resolution: fixed
Status: newclosed

thanks,

Hamish

Note: See TracTickets for help on using tickets.