wiki:proposals/HarvestingSchedule

Version 2 (modified by josegar74, 13 years ago) ( diff )

--

Harvesting schedule

Date 2012/02/12
Contact(s) Jose García
Last edited
Status being discussed
Assigned to release 2.7.0
Resources
Ticket #

Overview

Actual schedule for harvesters allow only to define an interval to run periodically the harvesters. The main disadvantage is that this interval is relative to the time the harvester is activated, being not possible to define specific hour to run it.

This proposal modifies the harvesters schedule to be similar as Lucene Index Optimizer schedule, allowing the user to define the initial hour to run them and an interval to reschedule (from 1 h to 1 week).

New harvesters schedule

Proposal Type

  • Type: GUI Change, Module Change
  • App: GeoNetwork
  • Module: Harvester
  • Documents:
  • Email discussions:
  • Other wiki discussions:

Voting History

  • Vote proposed by X on Y, result was +/-n (m non-voting members).

Motivations

The main motivation is to improve the schedule configuration for harvesters, so users can configure to run them at specific time.

Proposal

This feature changes the configuration of harvesters to configure the initial time to run a harvester and the interval to re-run it:

  • The initial time can be configured in intervals of 15 minutes

  • The interval values available are from 1 h to 1 week

These values could be easily customized in the files loc/XX/harvesting.xml

Backwards Compatibility Issues

The sql migration scripts should contain some sql commands to update existing harvesters with a default schedule: for example, can setup harvesters to run at specific hour and for the interval tu run by default every day.

Users will need to update in Administration UI these values if want another configuration.

Risks

Participants

  • Jose García

Attachments (2)

Download all attachments as: .zip

Note: See TracWiki for help on using the wiki.