Changes between Version 4 and Version 5 of 56ReleasePlan


Ignore:
Timestamp:
Sep 4, 2009, 4:51:26 AM (15 years ago)
Author:
dmorissette
Comment:

Added proposed schedule

Legend:

Unmodified
Added
Removed
Modified
  • 56ReleasePlan

    v4 v5  
    1 This is the MapServer 5.6 release plan adopted by the MapServer PSC on mm/dd/2009.
     1This is the MapServer 5.6 release plan adopted by the MapServer PSC on mm/dd/2009. (Not adopted yet)
    22
    33'''New Features and Major Bug Fixes'''
     
    2424'''Planned Dates'''
    2525
    26 We will plan for 3 betas and 2 release candidate (RC) over a 5 week period after the code freeze (1 beta/RC per week each Wednesday). This will lead us to a final release sometime around mm/dd/2009:
     26We will plan for 3 betas and 2 release candidate (RC) over a 6 week period after the feature freeze (1 beta/RC per week each Wednesday). This will lead us to a final release sometime around October 24th, 2009 (the day of the FOSS4G Code Sprint in Sydney):
    2727
    28     * Feature freeze - Fri.
    29     * 5.6.0-beta1 - Wed.
    30     * 5.6.0-beta2 - Wed.
    31     * 5.6.0-beta3 - Wed.
    32     * 5.6.0-rc1 - Wed.
    33     * 5.6.0-rc2 - Wed.
    34     * 5.6.0 (final) - Wed.
     28    * Feature freeze - Fri. Sept. 18, 2009
     29    * 5.6.0-beta1 - Wed. Sept. 23, 2009
     30    * 5.6.0-beta2 - Wed. Sept. 30, 2009
     31    * 5.6.0-beta3 - Wed. Oct. 7, 2009
     32    * 5.6.0-rc1 - Wed. Oct. 14, 2009
     33    * 5.6.0-rc2 - Tue. Oct. 20, 2009
     34    * 5.6.0 (final) - Sat. Oct. 24, 2009
    3535
    3636'''Release Manager (see [http://mapserver.org/development/rfc/ms-rfc-34.html MS RFC 34])'''
    37  TBD
     37
     38 Daniel Morissette
    3839
    3940'''SVN Tags/Branches'''