Changes between Version 2 and Version 3 of release_strategy


Ignore:
Timestamp:
Apr 7, 2008, 12:17:22 PM (16 years ago)
Author:
ticheler
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • release_strategy

    v2 v3  
    55 * Final Release is built two weeks after RC2
    66
    7 The Technical Steering Committee (TSC) can postpone a release by vote on the mailing list.
     7The Project Steering Committee (PSC) can postpone a release by vote on the mailing list.
    88
    99Branch strategy: