wiki:FirstMeeting

Version 4 (modified by warmerdam, 16 years ago) ( diff )

add non-release related items

First GDAL Meeting

Date: Tuesday, Nov 20, 2007

Time: 1900 GMT is 1PM Central or 2PM Eastern (world clock)

Place: #gdal on irc.freenode.net

Agenda

  • Select Chair and Secretary
  • Non Release Related
  • Release process
    • Do we want a more formalized process, ala MapServer, with freezes and sequential betas, etc? RFC Freeze?
    • Feature Freeze?
    • Release Manager?
    • Ticket referencing restriction for commits (ie post-commit hook that requires a ticket number in the commit comment) during beta period?
  • Outstanding development
    • Work that *must* make it into 1.5
    • Work that it would be nice to have done in time for 1.5
    • Bugs/features marked for 1.5 in Trac that can be deferred
  • Release Timeline
    • Select optimistic 1st beta and final release dates.
  • Documentation
    • For 1.5, should we consider a documentation snapshot that can stay sync'd with the stable 1.5 branch once it is out?
    • Do we need a doc similar to MapServer's migration doc to highlight significant and backward incompatible changes that 1.5 introduces?
    • What have you committed for 1.5? Frank's a great human ChangeLog generator, but it's a big task. Let's try and lessen its size.

Attachments (1)

Download all attachments as: .zip

Note: See TracWiki for help on using the wiki.